template/.planning/STATE.md

153 lines
9.7 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

---
gsd_state_version: 1.0
milestone: v1.0
milestone_name: milestone
current_phase: 3
current_phase_name: data-completion
status: executing
stopped_at: Phase 3 context gathered
last_updated: "2026-09-10T07:26:53.901Z"
last_activity: 2026-09-10
last_activity_desc: Phase 02 structural correction executed from user review
progress:
total_phases: 3
completed_phases: 2
total_plans: 24
completed_plans: 18
state_head: 2eebb0ad3fc0d3acfb19a41338c26155b7134f61
---
# Project State
## Project Reference
See: .planning/PROJECT.md (updated 2026-09-07)
**Core value:** 引擎能完整跑通一部魔塔——开局到结局,存档、战斗、地图、事件、剧情全链路可玩。
**Current focus:** Phase 3 — data-completion
## Current Position
Phase: 3 (data-completion) — EXECUTING
Plan: 1 of 6
Status: Executing Phase 3
Last activity: 2026-09-10 — Phase 3 execution started
Progress: [█████████░] 92%
## Performance Metrics
**Velocity:**
- Total plans completed: 5
- Average duration: N/A
- Total execution time: 0 hours
**By Phase:**
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| - | - | - | - |
**Recent Trend:**
- Last 5 plans: N/A
- Trend: N/A
*Updated after each plan completion*
**Per-Plan Metrics:**
| Plan | Duration | Tasks | Files |
|------|----------|-------|-------|
| Phase 01 P04 | 7min | 3 tasks | 2 files |
| Phase 01 P05 | 17min | 2 tasks | 4 files |
| Phase 01 P06 | 20min | 2 tasks | 4 files |
| Phase 01 P10 | 25min | 2 tasks | 5 files |
| Phase 01 P07 | 25min | 2 tasks | 5 files |
| Phase 01 P08 | 3min | 1 tasks | 1 files |
| Phase 01 P09 | 8min | 2 tasks | 2 files |
| Phase 01 P11 | 13min | 2 tasks | 3 files |
| Phase 01 P12 | 20min | 2 tasks | 6 files |
| Phase 01 P13 | 30 | 3 tasks | 11 files |
| Phase 02 P01 | 25min | 3 tasks | 2 files |
| Phase 02 P02 | 29min | 3 tasks | 10 files |
| Phase 02 P03 | 30 min | 4 tasks | 9 files |
| Phase 02 P04 | 10 min | 2 tasks | 7 files |
| Phase 02 P05 | 5min | 2 tasks | 2 files |
## Accumulated Context
### Decisions
Decisions are logged in PROJECT.md Key Decisions table.
Recent decisions affecting current work:
- 接口/架构设计由用户主导AI 仅做实现与测试
- 渲染层先于数据层完成重构(既有顺序延续)
- 阶段顺序调整为玩法优先:事件 + 寻路 → 数据端完成 → 渲染适配 → legacy 移植 → 单元测试
- AI 可在验证通过后自行创建 git commit无需用户逐次审批验证未通过不得提交
- [Phase 01]: Serialized event registration and map event-id binding remain deferred; CoreState retains only a TODO and no new public registration API is added.
- [Phase 01]: Source-aware dispatch uses IGameEventInvocation { id: string; env: IBlockEventEnv } and one full-sequence execute call.
- [Phase 01]: IMapLayerSave.pointEvents uses index -> priority -> eventId, independent from map-matrix dirty, with pure-baseline overlay loading and crop/clear resize semantics.
- [Phase 01]: Phase 01 Plan 05 preserves rawEvent as public Statement[] with constructor/setRaw aliasing, generic Promise<R>, and current as Promise<R> adapters; no defensive-copy, unknown, or cache-safety changes.
- [Phase 01]: Phase 01 Plan 05 defers eventStore circular dependencies, preserving current imports and behavior and recording the exact check:circular paths as the phase baseline.
- [Phase 01]: Plan 01-06 validates raw map event containers before registration and binds coordinate events to the event layer.
- [Phase 01]: Plan 01-10 restores raw tile defaults and implements the approved coordinate point-event lifecycle; map-level aggregation and registration remain deferred.
- [Phase 01]: Plan 01-07 dispatches one approved source-aware point/static/dynamic invocation sequence with trigger filtering before cut/reduce.
- [Phase 01]: Plans 01-08 and 01-09 remain unexecuted; their revised scope preserves rawEvent/Promise<R>/as adapters/cycles, tests only eventStore behavior, and isolates GameMap point-event aggregation without production registration.
- [Phase 01]: Plan 01-08 regression-tests GameEventStore through the public barrel and preserves rawEvent, Promise, and eventStore-cycle deferrals.
- [Phase 01]: Plan 01-09 preserves non-empty pointEvents as valid GameMap layer save content for LowCompression and HighCompression.
- [Phase 01]: Plan 01-09 validates point-event aggregation without production registration, map-id binding, rawEvent changes, or eventStore cycle repair.
- [Phase 01]: Phase 01 Plan 11 wires each legacy event alias layer to GameMap.eventLayer without adding serialized registration or map-id binding.
- [Phase 01]: Phase 01 Plan 11 preserves source-aware invocation, point-event persistence, rawEvent/cache/Promise/as, and eventStore-cycle deferrals.
- [Phase 01]: Gap-closure plan 01-12 repairs only the missing IBlockEventEnv import, focused fixture typing, and reported CRLF/Prettier errors; it preserves all locked deferrals and public contracts.
- [Phase 01]: Gap-closure Plan 01-12 imports IBlockEventEnv and types only the focused event/map fixtures without changing runtime behavior or public contracts.
- [Phase 01]: Gap-closure Plan 01-12 preserves serialized registration/map-id binding, rawEvent/cache/Promise/as, and eventStore-cycle deferrals.
- [Phase 01]: Plan 01-13: LayerEventView owns point-event refs with O(1) dirty state; MapLayer uses flat index storage and ref-first overlays; MapTileBase centralizes default restoration.
- [Phase 01]: Plan 01-13 preserves the approved save shape, resize semantics, locked deferrals, and leaves types.ts and executor.ts user edits untouched.
- [Phase 02]: [Phase 02] 02-01 拍板pathfinding/types.ts 由用户亲自编写接口事实源02-02/02-03 不得创建或重写该文件
- [Phase 02]: [Phase 02] 02-01 拍板mover.ts:651 坐标回写缺陷 go——授权 02-02 改为 || 并翻绿 4 个回归用例
- [Phase 02]: [Phase 02] 02-01 拍板D-08 触发语义=通行掩码允许到达且目标 no-pass 才触发 hit/OnTouch掩码不可达一律不触发实现机制须与该语义一致
- [Phase 02]: [Phase 02] 02-01 拍板:打断时序选选项 1stop 后 await 兑现再起新寻路);图方向性仅 4 正交向文件归属按草案原样types.ts 除外)
- [Phase 02]: [Phase 02]: 02-02 floorId 解析经 iterateAllMaps 引用匹配fromRaw 楼层默认 inactive激活层迭代会使真实谓词拿不到 floorId
- [Phase 02]: [Phase 02]: 02-02 L2 经结构化守卫 hasMover 取移动器(零 asmover.start() 返回 null 即已有移动进行中契约检测点
- [Phase 02]: [Phase 02]: 02-02 终端节点canPass 且 shouldHit在搜索层约束可作终点不可穿越D-08 情形 1 由 02-03 直接 find() 判定相邻格
- [Phase 02]: [Phase 02]: 02-02 moveTo 恒逐步,回退策略仅作用于 teleportTo 且 null 默认必定逐步(与用户 types.ts jsdoc 逐字对齐)
- [Phase 02]: L3 HeroPathfinding 注入 DefaultHeroMoveTopImpl 的 IPassPredicateL2 图搜索与 hero mover 共享同一通行性语义。
- [Phase 02]: D-08 no-pass 目标采用可达相邻格 + 面朝目标 + source-aware OnTouch 直派;无相邻可达格返回空路径。
- [Phase 02]: 同步寻路接口通过 queued controller 实现 stop 后 await再从最新坐标重算并启动新路径。
- [Phase 02]: D-07 remains authoritative: path/types.ts matches the user baseline except for the two authorized nullable returns; graph helper contracts stay implementation-owned.
- [Phase 02]: The concrete useMover bridge remains in PathfindingSystem so HeroPathfinding can bind IObjectMover without expanding the user-authored interface.
- [Phase 02]: D-11 remains intact: this plan modifies no client click adapter or Phase 1 file.
- [Phase 02]: Phase 02 Plan 05 sets Vitest testTimeout and hookTimeout to 30 seconds to cover full-suite beforeAll import cost.
- [Phase 02]: Phase 02 Plan 05 adds deterministic pnpm test:ci while preserving interactive pnpm test.
- [Phase 02]: Phase 02 Plan 05 preserves D-11 by modifying no client click adapter or Phase 1 file.
- [Phase 02]: 2026-09-10 用户结构审查修正graph 类型及注释归回 path/types.ts删除未授权的 HeroPathfinding L3 封装及其接线。
- [Phase 02]: 2026-09-10 用户结构审查修正DirectionMapper 由 IDataCommon 主对象共享注入;通行性谓词提取为 predicate.ts 的 DefaultPassPredicate。
- [Phase 02]: 2026-09-10 直接执行摘要 02-06旧的 L3 HeroPathfinding 相关验证记录仅代表历史实现,必须按修正后的 L2 范围重新验证。
### Pending Todos
None yet.
### Blockers/Concerns
- 数据层 L0L3 接口设计仍在进行中由用户主导DATA-01Phase 3依赖接口设计落地
- 01-08 rawEvent cache-safety and no-as implementation assumptions are explicitly removed from the revised executable scope; the 01-05 current contract remains unchanged.
- eventStore circular paths are explicitly preserved as the Phase 01 baseline; the revised 01-08 regression does not require those paths to disappear.
- Plan 01-12 leaves the repository-wide type gate blocked only by pre-existing diagnostics outside the plan-owned files; these are recorded in the phase deferred-items ledger.
- Plan 01-13 records the same repository-wide type gate diagnostics outside its implementation and test files in the phase deferred-items ledger.
## Deferred Items
| Category | Item | Status | Deferred At | Milestone |
|----------|------|--------|-------------|-----------|
| quality gate | Pre-existing TypeScript diagnostics outside Plan 01-12 files | deferred | 2026-09-09 | v1.0 |
| quality gate | Pre-existing TypeScript diagnostics outside Plan 01-13 files | deferred | 2026-09-09 | v1.0 |
## Session Continuity
Last session: 2026-09-10T04:02:44.223Z
Stopped at: Phase 3 context gathered
Resume file: .planning/phases/03-data-completion/03-CONTEXT.md