6.8 KiB
| gsd_state_version | milestone | current_phase | current_phase_name | status | stopped_at | last_updated | last_activity | last_activity_desc | state_head | progress | milestone_name | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | v1.0 | 02 | pathfinding | executing | Phase 2 context gathered | 2026-09-09T07:10:43.282Z | 2026-09-09 | Phase 01 verification passed: user confirmed compile-cache reuse and setRaw invalidation with no issue reported | 1ad8176f68 |
|
milestone |
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-09-07)
Core value: 引擎能完整跑通一部魔塔——开局到结局,存档、战斗、地图、事件、剧情全链路可玩。 Current focus: Phase 01 — event
Current Position
Phase: 02 (pathfinding) — READY TO EXECUTE Plan: 13 of 13 (point-event reference/storage refactor complete) Status: Plan 01-13 verification complete; ready for phase completion transition Last activity: 2026-09-09 — Plan 01-13 focused tests/lint passed; repository-wide type diagnostics remain deferred outside plan scope
Progress: [█████████░] 92%
Performance Metrics
Velocity:
- Total plans completed: 5
- Average duration: N/A
- Total execution time: 0 hours
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| - | - | - | - |
Recent Trend:
- Last 5 plans: N/A
- Trend: N/A
Updated after each plan completion Per-Plan Metrics:
| Plan | Duration | Tasks | Files |
|---|---|---|---|
| Phase 01 P04 | 7min | 3 tasks | 2 files |
| Phase 01 P05 | 17min | 2 tasks | 4 files |
| Phase 01 P06 | 20min | 2 tasks | 4 files |
| Phase 01 P10 | 25min | 2 tasks | 5 files |
| Phase 01 P07 | 25min | 2 tasks | 5 files |
| Phase 01 P08 | 3min | 1 tasks | 1 files |
| Phase 01 P09 | 8min | 2 tasks | 2 files |
| Phase 01 P11 | 13min | 2 tasks | 3 files |
| Phase 01 P12 | 20min | 2 tasks | 6 files |
| Phase 01 P13 | 30 | 3 tasks | 11 files |
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- 接口/架构设计由用户主导;AI 仅做实现与测试
- 渲染层先于数据层完成重构(既有顺序延续)
- 阶段顺序调整为玩法优先:事件 + 寻路 → 数据端完成 → 渲染适配 → legacy 移植 → 单元测试
- AI 可在验证通过后自行创建 git commit,无需用户逐次审批;验证未通过不得提交
- [Phase 01]: Serialized event registration and map event-id binding remain deferred; CoreState retains only a TODO and no new public registration API is added.
- [Phase 01]: Source-aware dispatch uses IGameEventInvocation { id: string; env: IBlockEventEnv } and one full-sequence execute call.
- [Phase 01]: IMapLayerSave.pointEvents uses index -> priority -> eventId, independent from map-matrix dirty, with pure-baseline overlay loading and crop/clear resize semantics.
- [Phase 01]: Phase 01 Plan 05 preserves rawEvent as public Statement[] with constructor/setRaw aliasing, generic Promise, and current as Promise adapters; no defensive-copy, unknown, or cache-safety changes.
- [Phase 01]: Phase 01 Plan 05 defers eventStore circular dependencies, preserving current imports and behavior and recording the exact check:circular paths as the phase baseline.
- [Phase 01]: Plan 01-06 validates raw map event containers before registration and binds coordinate events to the event layer.
- [Phase 01]: Plan 01-10 restores raw tile defaults and implements the approved coordinate point-event lifecycle; map-level aggregation and registration remain deferred.
- [Phase 01]: Plan 01-07 dispatches one approved source-aware point/static/dynamic invocation sequence with trigger filtering before cut/reduce.
- [Phase 01]: Plans 01-08 and 01-09 remain unexecuted; their revised scope preserves rawEvent/Promise/as adapters/cycles, tests only eventStore behavior, and isolates GameMap point-event aggregation without production registration.
- [Phase 01]: Plan 01-08 regression-tests GameEventStore through the public barrel and preserves rawEvent, Promise, and eventStore-cycle deferrals.
- [Phase 01]: Plan 01-09 preserves non-empty pointEvents as valid GameMap layer save content for LowCompression and HighCompression.
- [Phase 01]: Plan 01-09 validates point-event aggregation without production registration, map-id binding, rawEvent changes, or eventStore cycle repair.
- [Phase 01]: Phase 01 Plan 11 wires each legacy event alias layer to GameMap.eventLayer without adding serialized registration or map-id binding.
- [Phase 01]: Phase 01 Plan 11 preserves source-aware invocation, point-event persistence, rawEvent/cache/Promise/as, and eventStore-cycle deferrals.
- [Phase 01]: Gap-closure plan 01-12 repairs only the missing IBlockEventEnv import, focused fixture typing, and reported CRLF/Prettier errors; it preserves all locked deferrals and public contracts.
- [Phase 01]: Gap-closure Plan 01-12 imports IBlockEventEnv and types only the focused event/map fixtures without changing runtime behavior or public contracts.
- [Phase 01]: Gap-closure Plan 01-12 preserves serialized registration/map-id binding, rawEvent/cache/Promise/as, and eventStore-cycle deferrals.
- [Phase 01]: Plan 01-13: LayerEventView owns point-event refs with O(1) dirty state; MapLayer uses flat index storage and ref-first overlays; MapTileBase centralizes default restoration.
- [Phase 01]: Plan 01-13 preserves the approved save shape, resize semantics, locked deferrals, and leaves types.ts and executor.ts user edits untouched.
Pending Todos
None yet.
Blockers/Concerns
- 数据层 L0–L3 接口设计仍在进行中(由用户主导),DATA-01(Phase 3)依赖接口设计落地
- 01-08 rawEvent cache-safety and no-as implementation assumptions are explicitly removed from the revised executable scope; the 01-05 current contract remains unchanged.
- eventStore circular paths are explicitly preserved as the Phase 01 baseline; the revised 01-08 regression does not require those paths to disappear.
- Plan 01-12 leaves the repository-wide type gate blocked only by pre-existing diagnostics outside the plan-owned files; these are recorded in the phase deferred-items ledger.
- Plan 01-13 records the same repository-wide type gate diagnostics outside its implementation and test files in the phase deferred-items ledger.
Deferred Items
| Category | Item | Status | Deferred At | Milestone |
|---|---|---|---|---|
| quality gate | Pre-existing TypeScript diagnostics outside Plan 01-12 files | deferred | 2026-09-09 | v1.0 |
| quality gate | Pre-existing TypeScript diagnostics outside Plan 01-13 files | deferred | 2026-09-09 | v1.0 |
Session Continuity
Last session: 2026-09-09T06:27:22.453Z Stopped at: Phase 2 context gathered Resume file: .planning/phases/02-pathfinding/02-CONTEXT.md