chore: clear Phase 3 resume checkpoint

This commit is contained in:
unanmed 2026-09-11 15:39:21 +08:00
parent b8d33233b1
commit c41b84bef3
2 changed files with 0 additions and 134 deletions

View File

@ -1,66 +0,0 @@
{
"version": "1.0",
"timestamp": "2026-09-11T03:15:41.841Z",
"phase": "03",
"phase_name": "data-completion",
"phase_dir": ".planning/phases/03-data-completion",
"plan": 12,
"task": 2,
"total_tasks": 2,
"status": "paused",
"completed_tasks": [
{
"id": 1,
"name": "Move event registrations into modules",
"status": "done",
"commit": "9c39895"
},
{
"id": 2,
"name": "Update registration-table regression tests",
"status": "done",
"commit": "d2ebf1c"
}
],
"remaining_tasks": [
{"id": 13, "name": "Direct Statement[] event insertion", "status": "not_started"},
{"id": 14, "name": "Synchronous replay correction", "status": "not_started"},
{"id": 10, "name": "Legacy compatibility boundary", "status": "not_started"},
{"id": 11, "name": "Existing SaveSystem preservation", "status": "not_started"},
{"id": 15, "name": "Independent replay command classes", "status": "not_started"}
],
"blockers": [
{
"description": "User requested a session pause for personal reasons.",
"type": "human_action",
"workaround": "Resume with /gsd-resume-work."
}
],
"async_jobs": [],
"human_actions_pending": [],
"decisions": [
{
"decision": "Legacy remains compatibility-only; no new legacy boundary or MemorySaveSystem is allowed.",
"rationale": "User structural review supersedes the original Phase 3 Node/legacy decisions.",
"phase": "03"
},
{
"decision": "Replay commands remain synchronous and independent; @shouldReplay() placement is user-owned.",
"rationale": "Async replay obscures call-stack/source semantics and the user will place decorators on state mutation methods.",
"phase": "03"
},
{
"decision": "eventInsertEvent accepts Statement[] and executes directly.",
"rationale": "It is an inline event body operation, not an event-store ID lookup.",
"phase": "03"
}
],
"uncommitted_files": [
" M .planning/phases/03-data-completion/03-CONTEXT.md",
" M .planning/phases/03-data-completion/03-EVENT-CONTRACT.md",
" M .planning/phases/03-data-completion/03-REPLAY-CONTRACT.md",
" M .planning/phases/03-data-completion/03-VERIFICATION.md"
],
"next_action": "Run /gsd-resume-work, then execute correction Plan 03-13 after confirming the supersession records are present.",
"context_notes": "Plan 03-12 completed successfully. Do not execute Plan 03-10 or 03-11 before the dependency order says they are ready; the planner assigned 03-13 and 03-14 before the later legacy/save cleanup. Do not modify @shouldReplay() placement on HeroAttribute.set/mul or other user-owned state methods."
}

View File

@ -1,68 +0,0 @@
---
context: phase
phase: 03-data-completion
task: 12
total_tasks: 15
status: paused
last_updated: 2026-09-11T03:15:41.841Z
---
## Current State
Phase 3 structural correction is paused after correction Plan 03-12 completed. The original Phase 3 implementation is not accepted as structurally final because the user superseded several initial design decisions.
## Completed Work
- Plans 03-10 through 03-15 were created, reviewed, revised, and passed the plan checker.
- Plan 03-12 completed and committed as `9c39895`, `d2ebf1c`, and `83ca6d6`.
- `data-state/src/event/index.ts` now has registration/exports ownership changes from Plan 03-12.
- User supersession records are present in:
- `.planning/phases/03-data-completion/03-CONTEXT.md`
- `.planning/phases/03-data-completion/03-EVENT-CONTRACT.md`
- `.planning/phases/03-data-completion/03-REPLAY-CONTRACT.md`
- Structural review gaps are recorded in `03-VERIFICATION.md`.
## Remaining Work
Execute the reviewed correction plans in dependency order:
1. `03-13` — direct `Statement[]` event insertion
2. `03-14` — synchronous replay correction
3. `03-10` — remove Phase 3 legacy boundary and restore existing compatibility path
4. `03-11` — remove `MemorySaveSystem` and preserve `SaveSystem`
5. `03-15` — independent replay command classes
After execution:
1. Run the full Phase 3 data suite.
2. Run `pnpm test:data-node`.
3. Run `script/check-data-type.ts` and `script/check-data-circular.ts`.
4. Run scoped ESLint and Prettier.
5. Re-run the Phase 3 verifier and update `03-VERIFICATION.md`.
## User-Owned Boundary
Do not implement or relocate `@shouldReplay()` decorators. The user will add them to actual state-changing methods such as `HeroAttribute.set` and `HeroAttribute.mul` using the updated Stage 3 decorator configuration.
## Required Reading
1. `dev.md` — project rules and layer boundaries.
2. `.planning/phases/03-data-completion/03-CONTEXT.md` — latest supersession decisions S-01 through S-04.
3. `.planning/phases/03-data-completion/03-VERIFICATION.md` — correction gaps.
4. `.planning/phases/03-data-completion/03-13-PLAN.md` — first next plan.
5. `.planning/phases/03-data-completion/03-14-PLAN.md` — synchronous replay contract.
6. `.planning/phases/03-data-completion/03-10-PLAN.md` and `03-11-PLAN.md` — legacy/save restoration.
7. `.planning/phases/03-data-completion/03-15-PLAN.md` — final replay class split.
## Uncommitted Files
The following planning artifacts are intentionally uncommitted and must be preserved:
- `.planning/phases/03-data-completion/03-CONTEXT.md`
- `.planning/phases/03-data-completion/03-EVENT-CONTRACT.md`
- `.planning/phases/03-data-completion/03-REPLAY-CONTRACT.md`
- `.planning/phases/03-data-completion/03-VERIFICATION.md`
## Resume
Run `/gsd-resume-work` to restore this state. Do not start a new Phase 3 plan from scratch.