template/.planning/phases/09-minimum-browser-runnable
2026-10-12 18:29:19 +08:00
..
.gitkeep docs(09): 捕获 Phase 9 上下文(伞阶段 + 增量派发 + 两大任务方向) 2026-10-08 19:28:09 +08:00
09-01-PLAN.md fix(09): revise plans based on checker feedback (round 2) 2026-10-09 14:27:17 +08:00
09-01-SUMMARY.md docs(09-01): complete D-10 leaf/basic UI migration plan 2026-10-09 15:59:23 +08:00
09-02-PLAN.md fix(09): revise plans based on checker feedback (round 2) 2026-10-09 14:27:17 +08:00
09-02-SUMMARY.md docs(09-02): complete D-10 closure plan (remaining 4 modules + consumer rewire + delete render/ui) 2026-10-09 17:05:58 +08:00
09-03-PLAN.md fix(09): revise plans based on checker feedback (round 2) 2026-10-09 14:27:17 +08:00
09-03-SUMMARY.md docs(09-3): complete D-11 UI alignment plan (props.state + D-13 TODO) 2026-10-09 17:19:15 +08:00
09-04-PLAN.md fix(09): anchor 09-04 Task 0 pre-state regex to local leftStatus declaration (exclude leftStatusBarUI export) 2026-10-09 18:07:15 +08:00
09-04-SUMMARY.md docs(09-04): complete status ownership migration plan 2026-10-09 18:55:35 +08:00
09-05-PLAN.md docs(09): add task 2 plan 09-05 (migration UI repair) and mark progress 2026-10-10 14:59:31 +08:00
09-05-SUMMARY.md docs(09-05): complete migration UI repair plan (A prettier + B IUIController generics + C src/ui type errors) 2026-10-10 14:24:04 +08:00
09-06-PLAN.md fix(09): revise plans based on checker feedback 2026-10-10 19:20:47 +08:00
09-06-SUMMARY.md docs(09-06): complete book enemy handbook plan 2026-10-11 13:46:24 +08:00
09-07-PLAN.md fix(09): revise plans based on checker feedback 2026-10-10 19:20:47 +08:00
09-07-SUMMARY.md docs(09-07): complete equipbox plan summary 2026-10-11 14:31:49 +08:00
09-08-PLAN.md docs(09): revise book/equipbox/toolbox plans to consume new data-end interfaces 2026-10-10 19:12:37 +08:00
09-08-SUMMARY.md docs(09-08): complete toolbox 道具栏 plan 2026-10-11 14:43:37 +08:00
09-09-PLAN.md fix(09-minimum-browser-runnable): revise 09-09 plan per checker feedback 2026-10-10 22:23:01 +08:00
09-09-SUMMARY.md docs(09-09): complete shop UI plan summary 2026-10-11 14:57:31 +08:00
09-10-PLAN.md docs(09): add plan 09-10 for task 3 review fixes R-1..R-8 across five UIs 2026-10-11 15:31:23 +08:00
09-10-SUMMARY.md docs(09-10): complete review-fix R-1..R-8 plan summary 2026-10-11 15:58:50 +08:00
09-11-PLAN.md docs(09): add plan 09-11 for task 5 legacy interface read-only audit 2026-10-11 16:18:29 +08:00
09-11-SUMMARY.md docs(09-11): author legacy interface audit section C + summary 2026-10-11 16:34:38 +08:00
09-12-PLAN.md docs(09): add plan 09-12 for task 6 legacy interface replacement audit 2026-10-11 17:09:59 +08:00
09-12-SUMMARY.md docs(09-12): complete legacy interface replacement audit (section C + summary) 2026-10-11 17:29:43 +08:00
09-13-PLAN.md fix(09): add A-5-1 to 09-13 non-ALT connected-elimination list 2026-10-11 20:06:34 +08:00
09-13-SUMMARY.md docs(09-13): complete plan (fallback layer removal + callsite direct-connect) 2026-10-12 16:14:57 +08:00
09-14-PLAN.md docs(09): revise 09-14/09-15 per D-54 (defer save-system-related entries) 2026-10-12 18:29:19 +08:00
09-14-SUMMARY.md docs(09-14): record R2 blocker for GameStorage->SaveSystem + A-2-1 umbrella coverage 2026-10-12 16:46:21 +08:00
09-15-PLAN.md docs(09): revise 09-14/09-15 per D-54 (defer save-system-related entries) 2026-10-12 18:29:19 +08:00
09-16-PLAN.md fix(09): add A-5-1 to 09-13 non-ALT connected-elimination list 2026-10-11 20:06:34 +08:00
09-CONTEXT.md docs(09): record D-54 (defer save-system-related legacy adaptations) 2026-10-12 16:55:31 +08:00
09-LEGACY-INTERFACES-AUDIT.md docs(09-11): author legacy interface audit section C + summary 2026-10-11 16:34:38 +08:00
09-LEGACY-REPLACEMENT-AUDIT.md docs(09-12): complete legacy interface replacement audit (section C + summary) 2026-10-11 17:29:43 +08:00
09-PATTERNS.md fix(09): revise plans based on checker feedback (round 2) 2026-10-09 14:27:17 +08:00