Commit Graph
154 Commits
Author SHA1 Message Date
AncTe cdba0161c7 docs(10): sync phase 10 state, context, and advanced II plans 2026-10-21 17:23:47 +08:00
AncTe f654b39b31 docs(10): 规划高级 I 七篇与读者修订循环 2026-10-19 20:28:27 +08:00
AncTe 49ecbfb89e docs(10): add D-09 review revision plans (10-07..10-12) 2026-10-17 20:25:05 +08:00
AncTe 1099583b07 docs(10): rewrite 10-01 to clear legacy docs + register intermediate; refresh 10-06/10-CONTEXT/ROADMAP 2026-10-17 16:36:11 +08:00
AncTe 6a42bf42d4 docs(10): create phase plan (intermediate tutorial 24 docs + site registration) 2026-10-16 21:06:26 +08:00
AncTe 8509d91216 docs: 阶段十文档更新 2026-10-14 15:37:44 +08:00
AncTe a6e2d83233 docs(09): mark plans 09-14/09-15/09-16 temporarily unexecutable (BLOCKED) 2026-10-13 13:41:50 +08:00
AncTe 534e7dee29 docs(09): record plan 09-15 outcome (R2 STOP; UI-open cluster deferred) 2026-10-13 11:46:14 +08:00
AncTe 0eb09d83fd docs(09): record plan 09-14 outcome (R2 STOP; A-1-1 deferred) 2026-10-12 16:47:52 +08:00
AncTe 2d99b090e3 docs(09): mark plan 09-13 complete in roadmap progress 2026-10-12 16:16:42 +08:00
AncTe 8819faa93b docs(09): sync roadmap progress for plans 09-13..09-16 (task 7 batch) 2026-10-12 15:52:26 +08:00
AncTe 537bcbee02 docs(09): mark plan 09-12 complete in roadmap progress 2026-10-11 17:30:48 +08:00
AncTe 08f24f25f7 docs(09): add plan 09-12 for task 6 legacy interface replacement audit 2026-10-11 17:09:59 +08:00
AncTe 4cf1f00ef7 docs(09): mark plan 09-11 complete in roadmap progress 2026-10-11 16:35:37 +08:00
AncTe 741e8e09ce docs(09): add plan 09-11 for task 5 legacy interface read-only audit
Task 5 (D-42..D-45): produce a read-only statistics doc covering exactly packages-user/client-base and packages-user/client-modules. Categories: A residual legacy interfaces, B @deprecated, C core.* call sites. Zero source edits.
2026-10-11 16:18:29 +08:00
AncTe 109ff4b860 docs(09): mark plan 09-10 complete in roadmap progress 2026-10-11 15:59:26 +08:00
AncTe cb133685f2 docs(09): add plan 09-10 for task 3 review fixes R-1..R-8 across five UIs 2026-10-11 15:31:23 +08:00
AncTe a495928c55 docs(09): mark plan 09-09 complete in roadmap progress 2026-10-11 14:58:32 +08:00
AncTe 2c127a0e56 docs(09): mark plan 09-08 complete in roadmap progress 2026-10-11 14:44:11 +08:00
AncTe e575944df5 docs(09): mark plan 09-07 complete in roadmap progress 2026-10-11 14:32:23 +08:00
AncTe e321753058 docs(09): mark plan 09-06 complete in roadmap progress 2026-10-11 13:47:59 +08:00
AncTe 7f0c90e3af docs(09): finalize shop plan (09-09) - GAP-S4 resolved, OI-S6 confirmed, drop hotkey name caveat 2026-10-10 20:18:37 +08:00
AncTe ff71899f12 docs(09): create phase plan (09-09 shop) 2026-10-10 19:38:58 +08:00
AncTe 337d28c1d7 docs(09): revise book/equipbox/toolbox plans to consume new data-end interfaces
- book: wire base-attribute critical/damage via calculateEnemyCritical; rename calculateCritical->calculateViewCritical; @user/data-system dependency already declared (no package.json change)
- equipbox: single-equipment delta via compareEquip(uid,-1,slot)/(-1,uid,slot)
- toolbox: enumerate owned items via IHeroItems.iterateItems() (drop saveState workaround)
2026-10-10 19:12:37 +08:00
AncTe 1d0c7db3cc docs(09): plan task 3 book/equipbox/toolbox (pending data-end interfaces) 2026-10-10 18:27:34 +08:00
AncTe cdfe7ffc76 docs(09): add task 2 plan 09-05 (migration UI repair) and mark progress 2026-10-10 14:59:31 +08:00
AncTe 46bcafcfbb docs(09): mark plan 09-04 complete in roadmap progress 2026-10-09 18:56:04 +08:00
AncTe f18d577b77 docs(09-4): redesign plan — status ownership into statusBar + per-field hooks/TODO 2026-10-09 17:55:24 +08:00
AncTe 3f2e3b1083 docs(09): mark plan 09-03 complete in roadmap progress 2026-10-09 17:19:45 +08:00
AncTe 804844e5b5 docs(09): mark plan 09-02 complete in roadmap progress 2026-10-09 17:06:34 +08:00
AncTe 6a3812252b docs(09): mark plan 09-01 complete in roadmap progress 2026-10-09 16:00:28 +08:00
AncTe 5bda40f083 docs(09): 收口任务 1 规划(决策覆盖/状态/波次标注) 2026-10-09 14:59:15 +08:00
AncTe d53188af1f docs(09): create phase plan for task 1 UI interface adaptation 2026-10-09 13:55:56 +08:00
AncTe af58dd3731 docs: 标记 Phase 4-6 为已过时并新增 Phase 9(最小浏览器可运行版本) 2026-10-08 19:28:02 +08:00
AncTe c466949ce0 docs(phase-08): complete phase execution 2026-10-08 17:01:41 +08:00
AncTe 73cf808666 docs(08-11): complete phase 8 closure plan 2026-10-08 16:36:06 +08:00
AncTe 41f743debc docs(08-10): complete coverage and interface alignment plan 2026-10-08 15:57:05 +08:00
AncTe 339f72d541 docs(08-09): complete data-state integration test alignment plan 2026-10-07 19:17:17 +08:00
AncTe 58a554e40a docs(08-08): complete data-state src alignment plan 2026-10-07 18:07:47 +08:00
AncTe 3e22e3e14a docs(08-07): complete path test alignment plan 2026-10-05 18:55:43 +08:00
AncTe 4208857eff docs(08-06): complete combat/event test alignment plan 2026-10-05 17:30:32 +08:00
AncTe 0d41abdaf6 docs(08-05): record map alignment summary and plan progress
- add 08-05-SUMMARY.md (status complete; D-10 production fixes + test alignments + gate evidence)

- mark 08-05-PLAN.md done and bump Phase 8 progress to 4/11
2026-10-05 15:20:06 +08:00
AncTe 132ea9fc3a docs(08-04): record hero alignment summary and plan progress 2026-10-04 23:35:01 +08:00
AncTe 8153d4f419 docs(08-03): record enemy/flag alignment summary and plan progress 2026-10-04 22:17:01 +08:00
AncTe 17e292274b docs(08-02): record data-common alignment summary and plan progress 2026-10-04 18:32:53 +08:00
AncTe b053c509c7 docs(08): plan phase 8 test refactor and alignment
Register Phase 8 (TEST-02), mark 07-16 superseded, add CONTEXT/RESEARCH/PATTERNS/PLAN-CHECK and 08-01..08-11 plans; record 08-01 migration summary.
2026-10-04 17:34:18 +08:00
AncTe e25ef3fa93 refactor: combat system 2026-10-03 16:04:20 +08:00
AncTe 548ad9eb7d docs(04-14): update roadmap/state tracking 2026-09-30 16:38:04 +08:00
AncTe cab6fe2e5a docs(04-14): register UI adaptation implementation plan (step 2) 2026-09-30 16:10:47 +08:00
AncTe e48995a293 docs(04-13): update roadmap/state tracking 2026-09-30 14:56:56 +08:00